04 June, 2015
At the end of May, 2005 our company under ZAO “ROSENGINEERING ENERGY” order proceeded to realization of the project of design, manufacture and erection of air pipeline for Air Intake System and Ventilation of KAWASAKI GPB80D type gas turbine. According to the project air pipelines should be integrated to the existing building with a constrained layout. To reach Costumer’s requirements it was need to apply original and special technical solutions for design.