25 July, 2017
In July 2017 specialists of Advice Turbine Engineering took part in commissioning and definition of warranted characteristics of LM 6000 gas turbine with modified AIS on PGU 235 Astrakhanskaya GRES.
During this work coolant delivery pipe network and coolant system parameters were corrected. As a result it was managed to reach the guaranteed performance parameters of the LM 6000 gas turbines in hot ambient temperatures.